db.m8g.largevsdb.m8i.large
db.m8g.large is 12% cheaper than db.m8i.large on demand in US East (N. Virginia), saving $16.06 a month. They use different processor architectures (arm64 and x86_64), so software built for one may need rebuilding to run on the other.
| At a glance | db.m8g.large | db.m8i.large |
|---|---|---|
| On-demand | $0.168/hr12% less | $0.19/hr |
| Lowest rate | $0.0789/hr12% less3-yr reserved, no upfront | $0.0893/hr3-yr reserved, no upfront |
| Size | 2 vCPUs, 8 GiB | 2 vCPUs, 8 GiB |
| Architecture | arm64 | x86_64 |
Prices in US East (N. Virginia)
“Off” is the discount against each type’s own on-demand price. PostgreSQL, USD per hour.
| Option | db.m8g.large | db.m8i.large | db.m8i.large vs db.m8g.large |
|---|---|---|---|
| On-demandPay by the hour | $0.168 | $0.19 | ▲ 13% |
| 1-yr reservedNo upfront | 33% off$0.113 | 33% off$0.1273 | ▲ 13% |
| 3-yr reservedNo upfront | 53% off$0.0789 | 53% off$0.0893 | ▲ 13% |
| 1-yr savings planHourly commitment | 20% off$0.1344 | 20% off$0.152 | ▲ 13% |
Key differences
The biggest lead each one has.
Where db.m8g.large leads
On-demand price$0.168 vs $0.19 per hour
12% cheaperPhysical cores2 vs 1
2× higherWhere db.m8i.large leads
Sustained clock3.9 GHz vs 2.8 GHz
39% higherEBS baseline bandwidth650 Mbps vs 630 Mbps
3% higherSpecs
15 of 24 specs differ. Those are in bold.
| Compute6 of 8 differ | db.m8g.large | db.m8i.large |
|---|---|---|
| vCPUs | 2 | 2 |
| Physical cores | 2 | 1 |
| Threads per core | 1 | 2 |
| Architecture | arm64 | x86_64 |
| Processor | – | Intel Xeon Scalable (Granite Rapids) |
| CPU maker | AWS | Intel |
| Sustained clock | 2.8 GHz | 3.9 GHz |
| Burstable | No | No |
| MemoryAll 1 match | db.m8g.large | db.m8i.large |
|---|---|---|
| Memory (GiB) | 8 | 8 |
| Networking1 of 3 differ | db.m8g.large | db.m8i.large |
|---|---|---|
| Network | – | Up to 12500 Megabit |
| Network baseline | 0.937 Gbps | 0.937 Gbps |
| Network peak | 12.5 Gbps | 12.5 Gbps |
| Storage3 of 7 differ | db.m8g.large | db.m8i.large |
|---|---|---|
| Storage | – | EBS Only |
| EBS baseline bandwidth | 630 Mbps | 650 Mbps |
| EBS max bandwidth | 10,000 Mbps | 10,000 Mbps |
| EBS baseline throughput | 78.75 MB/s | 81.25 MB/s |
| EBS max throughput | 1,250 MB/s | 1,250 MB/s |
| EBS baseline IOPS | 3,600 | 3,600 |
| EBS max IOPS | 40,000 | 40,000 |
| Instance details4 of 4 differ | db.m8g.large | db.m8i.large |
|---|---|---|
| Family | m8g | m8i |
| Category | – | General purpose |
| Current generation | – | Yes |
| Normalization factor | 4 | – |
| Other1 of 1 differ | db.m8g.large | db.m8i.large |
|---|---|---|
| Hardware Basis | m8g.large | m8i.large |
On-demand prices by region
Cheapest for db.m8g.large first. PostgreSQL, USD per hour.
| Region | db.m8g.large | db.m8i.large | Difference |
|---|---|---|---|
| US East (N. Virginia)Used in summaryus-east-1 | $0.168 | $0.19 | ▲ 13% |
| US East (Ohio)us-east-2 | $0.168 | $0.19 | ▲ 13% |
| US West (Oregon)us-west-2 | $0.168 | $0.19 | ▲ 13% |
| Canada West (Calgary)ca-west-1 | $0.186 | $0.21 | ▲ 13% |
| EU (Ireland)eu-west-1 | $0.186 | $0.207 | ▲ 11% |
| Europe (Spain)eu-south-2 | $0.186 | $0.21 | ▲ 13% |
| US West (N. California)us-west-1 | $0.192 | $0.21 | ▲ 9% |
| EU (London)eu-west-2 | $0.195 | $0.216 | ▲ 11% |
| EU (Paris)eu-west-3 | $0.195 | $0.22 | ▲ 13% |
| Asia Pacific (Malaysia)ap-southeast-5 | $0.199 | $0.23 | ▲ 16% |
| EU (Frankfurt)eu-central-1 | $0.2 | $0.22 | ▲ 10% |
| Africa (Cape Town)af-south-1 | $0.222 | $0.25 | ▲ 13% |
| Asia Pacific (Singapore)ap-southeast-1 | $0.234 | $0.26 | ▲ 11% |
| Asia Pacific (Sydney)ap-southeast-2 | $0.234 | $0.26 | ▲ 11% |
| Asia Pacific (Tokyo)ap-northeast-1 | $0.234 | $0.26 | ▲ 11% |
| Asia Pacific (Seoul)ap-northeast-2 | $0.2344 | $0.26 | ▲ 11% |
| Asia Pacific (Hyderabad)ap-south-2 | $0.24 | $0.27 | ▲ 13% |
| Asia Pacific (Mumbai)ap-south-1 | $0.24 | $0.27 | ▲ 13% |
| South America (Sao Paulo)sa-east-1 | $0.2671 | $0.24 | ▼ 10% |
Keep exploring
Each type’s own page, and how it compares with others.
AWS RDS PostgreSQL prices in USD. Monthly figures use 730 hours. Prices last updated 12 Nov 2026.